Vizsla Silver Halts Operations On Site Over Security Concerns

Ongoing work at Vizsla Silver’s (TSX: VZLA) flagship Panuco project has been halted as a result of security concerns in the area.

The company on Friday announced that all on-site activity has been placed on pause “out of an abundance of caution” over the current security situation in the area. While Vizsla has stated that it will not delay the ongoing engineering work associated with an in progress feasibility study, other areas of the operation are said to be impacted.

The pause will have an immediate impact on ongoing exploration efforts on site, including a geotechnical drill campaign, the development of a test mine, and a regional exploration program. The company in January indicated that it plans to conduct 12,000 metres of geotechnical drilling to support the feasibility study in 2025, alongside 25,000 metres of discovery-based and resource expansion drilling, and the development of a test mine and bulk sample program at Copala.

Nord Precious Metals — sponsored Sponsored · Nord Precious Metals

The halt of work onsite follows a pause of operations in January that occurred after a landslide resulted in the death of drilling contractor while another contractor was placed into critical condition.

A timeline has not been provided for the resumption of activities on site.

Vizsla Silver last traded at $2.69 on the TSX.


Information for this story was found via the sources and companies mentioned. The author has no securities or affiliations related to the organizations discussed. Not a recommendation to buy or sell. Always do additional research and consult a professional before purchasing a security. The author holds no licenses.

Video Articles

Silver Is in a New Price Regime, and the Market Isn’t Used to It | Keith Neumeyer – First Majestic

Agnico Eagle Just Made a Massive Gold Land Grab

A Copper-Gold Deposit Caught the White House’s Attention | Rob McLeod – Cambria Gold

Recommended

Mercado Drills 256 g/t Silver Over 6.5 Metres In First Drill Hole of Inaugural Program

Antimony Resources Drills 4.38% Sb Over 7.05 Metres At Bald Hill In Final Hole Of 2025 Program

Trending

Related News

Vizsla Silver Board Gives OK For Vizsla Copper Corp Spinout

Vizsla Silver Corp. (TSXV: VZLA) announced this morning that its board has approved the spinout...

Tuesday, April 20, 2021, 08:11:12 AM

Vizsla Silver Hits 1,139 g/t Silver, 11.48 g/t Gold Over 4.30 Metres

Vizsla Silver Corp (TSXV: VZLA) released further drill results this morning. The results for a...

Thursday, June 2, 2022, 08:19:28 AM

Vizsla Silver PEA Outlines US$1.14 Billion NPV For Panuco Project

Vizsla Silver (TSXV: VZLA) has completed a preliminary economic assessment for its flagship Panuco silver-gold...

Wednesday, July 24, 2024, 08:23:01 AM

Becoming the World’s Largest Silver Producer with Michael Konnert of Vizsla Silver

In this insightful interview, Michael A. Konnert, President and CEO of Vizsla Silver Corp. (TSXV:...

Friday, August 2, 2024, 03:19:00 PM

Vizsla Silver Hits 1,935 g/t Silver, 15.47 g/t Gold Over 1.46 Metres

Vizsla Silver (TSXV: VZLA) provided the latest results from drill testing its Panuco silver-gold project...

Wednesday, September 7, 2022, 09:24:40 AM