First Mining Expands Miroir Discovery, Drills 7.18 g/t Gold Over 8 Metres

First Mining Gold Corp. (TSX: FF) has announced their latest drill results from their Duparquet Gold Project in Quebec, headlined by a high-grade intercept of 7.18 g/t gold over 8.0 metres at the Miroir target. These results, stemming from the company’s 2025 exploration program, continue to demonstrate the growth potential of the project located in the prolific Abitibi region.

The latest assay results from the Miroir target have successfully extended the mineralization to a vertical depth of 250 metres, which is a 150-metre down-dip expansion from previous drilling. The target has a strike length of 150 metres, and remains open at depth and along strike.

Drill highlights include:

Antimony Resources — sponsored Sponsored · Antimony Resources
  • DUP25-081: 1.56 g/t gold over 33.15 metres from a depth of 223.7 metres,
    • Including 3.18 g/t gold over 7.6 metres
  • DUP25-085: 3.74 g/t gold over 15.5 metres from a depth of 53.0 metres
    • And7.18 g/t gold over 8.0 metres from a depth of 148.0 metres,
      • Including 30.58 g/t gold over 1.65 metres
  • DUP25-090: 4.08 g/t gold over 12.0 metres from a depth of 320.9 metres
    • Including 11.20 g/t gold over 1.0 metre

“The Project’s near-surface mineralization footprint continues to be strengthened with our ongoing drilling success while further extending the target at depth, demonstrating Miroir’s potential as a resource-growth area at the Duparquet Project,” stated Dan Wilton, CEO of First Mining.

Beyond exploration, First Mining has launched a comprehensive environmental baseline data collection program to support the regulatory approval process. The initiative is being led by the company’s in-house sustainability team with support from Stantec, utilizing expertise gained from the development of the Greenstone Gold Mine.

With over 16,500 metres of drilling completed in 2025, First Mining is currently integrating this data into updated geological models. The company expects to resume drilling in the second quarter of 2026, focusing on high-priority expansion targets to further optimize the project’s value.

First Mining last traded at $0.56 on the TSX.


Information for this story was found via the sources and companies mentioned. The author has no securities or affiliations related to the organizations discussed. Not a recommendation to buy or sell. Always do additional research and consult a professional before purchasing a security. The author holds no licenses.

Video Articles

Silver Is in a New Price Regime, and the Market Isn’t Used to It | Keith Neumeyer – First Majestic

Agnico Eagle Just Made a Massive Gold Land Grab

A Copper-Gold Deposit Caught the White House’s Attention | Rob McLeod – Cambria Gold

Recommended

Mercado Drills 256 g/t Silver Over 6.5 Metres In First Drill Hole of Inaugural Program

Antimony Resources Drills 4.38% Sb Over 7.05 Metres At Bald Hill In Final Hole Of 2025 Program

Trending

Related News

First Mining Sells Cameron Project For $27 Million To Fiore Group Backed Oronova Energy

First Mining Gold (TSX: FF) has entered into an arrangement to sell their Cameron Gold...

Thursday, November 20, 2025, 08:18:51 AM

First Mining’s Springpole Gold Project Poised To Inject $15 Billion Into Canadian Economy

First Mining Gold Corp. (TSX: FF) has unveiled a new socio-economic analysis for its Springpole...

Wednesday, January 7, 2026, 08:47:24 AM

First Mining: Springpole Sees NPV Rise To $2.1 Billion

Third quarter earnings are done and over with, and are now well behind us in...

Sunday, December 7, 2025, 07:39:00 AM

Red Lake District: Home to High-Grade Gold Deposits and Great Bear Resources, a Gold Rush Catalyst

The Red Lake mining district in Northwestern Ontario is best known for its high-grade gold...

Sunday, July 12, 2020, 11:20:54 AM

Why $10K Gold No Longer Sounds Crazy | Dan Wilton – First Mining Gold

Dan Wilton, CEO of First Mining Gold (TSX: FF), has a front-row seat to what’s...

Thursday, September 18, 2025, 03:40:00 PM